Caltrans D6 Maintenance Center - Maintenance and Construction Management Functionality

Subsystem Description

The Maintenance and Construction Management Subsystem (MCMS) monitors and manages roadway infrastructure construction and maintenance activities. Representing both public agencies and private contractors that provide these functions, this subsystem manages fleets of maintenance, construction, or special service vehicles (e.g., snow and ice control equipment). The subsystem receives a wide range of status information from these vehicles and performs vehicle dispatch, routing, and resource management for the vehicle fleets and associated equipment. The subsystem participates in incident response by deploying maintenance and construction resources to an incident scene, in coordination with other center subsystems. The subsystem manages equipment at the roadside, including environmental sensors and automated systems that monitor and mitigate adverse road and surface weather conditions. The subsystem manages the repair and maintenance of both non-ITS and ITS equipment including the traffic controllers, detectors, dynamic message signs, signals, and other equipment associated with the roadway infrastructure. Additional interfaces to weather information providers (the weather service and surface transportation weather service providers) provide current and forecast weather information that can be fused with other data sources and used to support advanced decision support systems that increase the efficiency and effectiveness of maintenance and construction operations. 

The subsystem remotely monitors and manages ITS capabilities in work zones, gathering, storing, and disseminating work zone information to other systems. It manages traffic in the vicinity of the work zone and advises drivers of work zone status (either directly at the roadside or through an interface with the Information Service Provider or Traffic Management subsystems.) It schedules and manages the location and usage of maintenance assets (such as portable dynamic message signs).  

Construction and maintenance activities are tracked and coordinated with other systems, improving the quality and accuracy of information available regarding closures and other roadway construction and maintenance activities.

Functional Area: MCM Data Collection

Collection and storage of maintenance and construction information. For use by operations personnel or data archives in the region.

IDRequirementStatus
1The center shall collect maintenance and construction data (such as field equipment status, infrastructure status, maintenance and construction activity data) gathered from roadway, traffic, and other maintenance and construction sources.Planned
2The center shall assign quality control metrics and meta-data to be stored along with the data. Meta-data may include attributes that describe the source and quality of the data and the conditions surrounding the collection of the data.Planned
3The center shall receive and respond to requests from ITS Archives for either a catalog of the maintenance and construction data or for the data itself.Planned
4The center shall be able to produce sample products of the data available.Planned
5The center shall provide data to Asset Management to be used in updating the status of assets in the inventory.Planned

Functional Area: MCM Environmental Information Collection

Remotely controls environmental sensors and assimilates collected data with environmental probe data and other current and forecast road conditions and surface weather information from weather service providers and transportation operations.

IDRequirementStatus
1The center shall remotely control environmental sensors that measure road surface temperature, moisture, icing, salinity, and other measures.Planned
2The center shall remotely control environmental sensors that measure weather conditions including temperature, wind, humidity, precipitation, and visibility.Planned
3The center shall remotely control environmental sensors on-board maintenance and construction vehicles that measure road and weather conditions including air and surface temperatures, wind speed, humidity, precipitation, visibility and other measures.Planned
4The center shall collect environmental probe data (air temperature, exterior light status, wiper status, traction control status, etc.) from short range communications equipment that communicates with appropriately equipped probe vehicles.Planned
5The center shall assimilate current and forecast road conditions and surface weather information using a combination of weather service provider information (such as the National Weather Service and value-added sector specific meteorological services), data from traffic and traveler information providers, and environmental data collected from sensors deployed on and about the roadway as well as the fleet of maintenance and construction vehicles and the broader population of vehicle probes.Planned
6The center shall provide weather and road condition information to weather service providers and center personnel.Planned
7The center shall respond to control data from center personnel regarding environmental sensor control and weather data collection and processing.Planned
8The center shall collect operational status for the roadside and vehicle-based environmental sensor equipment.Planned
9The center shall collect fault data for the roadside and vehicle-based environmental sensor equipment for repair.Planned

Functional Area: MCM Incident Management

Supports coordinated response to incidents - share incident notifications, manage incident response resources, and coordinate overall incident situation and response among allied response organizations.

IDRequirementStatus
1The center shall receive inputs from the Alerting and Advisory System concerning the possibility or occurrence of severe weather, terrorist activity, or other major emergency, including information provided by the Emergency Alert System.Planned
2The center shall exchange alert information and status with emergency management centers. The information includes notification of a major emergency such as a natural or man-made disaster, civil emergency, or child abduction. The information may include the alert originator, the nature of the emergency, the geographic area affected by the emergency, the effective time period, etc.Planned
3The center shall exchange incident and threat information with emergency management centers as well as traffic management centers; including notification of existence of incident and expected severity, location, time and nature of incident.Planned
4The center shall coordinate planning for incidents with emergency management centers - including pre-planning activities for disaster response, evacuation, and recovery operations.Planned
5The center shall respond to requests from emergency management to provide maintenance and construction resources to implement response plans, assist in clean up, verify an incident, etc. This may also involve coordination with traffic management centers and other maintenance centers.Planned
6The center shall exchange road network status assessment information with emergency management and traffic management centers including an assessment of damage sustained by the road network including location and extent of the damage, estimate of remaining capacity, required closures, alternate routes, necessary restrictions, and time frame for repair and recovery.Planned
7The center shall provide work zone activities affecting the road network including the nature of the maintenance or construction activity, location, impact to the roadway, expected time(s) and duration of impact, anticipated delays, alternate routes, and suggested speed limits. This information may be augmented with images that provide a visual indication of current work zone status and traffic impacts.Planned
8The center shall receive information indicating the damage sustained by transportation assets, derived from aerial surveillance, field reports, inspections, tests, and analyses to support incident management.Planned

Functional Area: MCM Infrastructure Monitoring

Remotely monitors the condition of pavement, bridges, tunnels, associated hardware, and other transportation-related infrastructure (e.g., culverts) using vehicle-based and roadway-based infrastructure monitoring sensors.

IDRequirementStatus
1The center shall remotely control and collect data from fixed infrastructure monitoring sensors that monitor vibration, stress, temperature, surface continuity, and other condition measures.Planned
3The center shall remotely collect data from vehicle probes using short range communications equipment and process this data to identify potential pavement degradation, potholes, and other rough or adverse road surface conditions.Planned
4The center shall process the collected information and use it to monitor the condition of pavement, bridges, tunnels, associated hardware, and other transportation-related infrastructure.Planned
5The center shall collect current maintenance and repair needs from the asset management system and correlate this data with data collected through infrastructure monitoring systems.Planned
6The center shall provide current infrastructure conditions information to the asset management system.Planned
7The center shall report infrastructure repair needs to the maintenance management system.Planned

Functional Area: MCM Maintenance Decision Support

Maintenance Decision Support Systems recommend courses of action based on current and forecast environmental and road conditions (filtered and fused for specific time horizons) and additional application specific information. Recommendations and dispatch instructions are generated based on this integrated information.

IDRequirementStatus
1The center shall provide the center personnel with tailored external information, including weather or road condition observations, forecasted weather information or road conditions, current usage of treatments and materials, available resources, equipment and vehicle availability, road network information, and source reliability information.Planned
2The center shall tailor the decision support information to include filtering (selection from a large amount of external information), error reduction ('smoothing' the information), fusion (combination of disparate information to match the decision needs), and analysis (creating the decision).Planned
3The center shall provide an interface to the center personnel to input control parameters for the decision support process and receive decisions or information presentation.Planned
4The center shall provide dispatch information to maintenance and construction vehicles based on the outputs of the decision support system, including recommended roadway treatment actions.Planned

Functional Area: MCM Roadway Maintenance and Construction

Overall management and support for routine maintenance on the roadway or right-of-way. Includes landscape maintenance, hazard removal (roadway debris, dead animals), routine maintenance activities (roadway cleaning, grass cutting), and repair and maintenance of both ITS and non-ITS equipment.

IDRequirementStatus
1The center shall maintain an interface with asset management systems to track the inventory, restrictions, repair needs and status updates of transportation assets (pavement, bridges, signs, etc.) including location, installation and materials information, vendor/contractor, current maintenance status, standard height, width, and weight restrictions.Planned
2The center shall respond to requests from emergency management and traffic management centers for hazard removal, field equipment repair, and other roadway maintenance.Planned
4The center shall provide emergency management and traffic management centers with information about scheduled maintenance and construction work activities including anticipated closures and impact to the roadway, alternate routes, anticipated delays, closure times, and durations.Planned
5The center shall collect the status and fault data from roadside equipment, such as traffic, infrastructure, and environmental sensors, highway advisory radio and dynamic message signs, automated roadway treatment systems, barrier and safeguard systems, cameras, traffic signals and override equipment, ramp meters, short range communications equipment, security sensors and surveillance equipment, etc., and provide a cohesive view of equipment repair needs.Planned
6The center shall collect the status and fault data from the centers that operate the equipment, including data for traffic, infrastructure, and environmental sensors, highway advisory radio and dynamic message signs, automated roadway treatment systems, barrier and safeguard systems, cameras, traffic signals and override equipment, ramp meters, short range communications equipment, security sensors and surveillance equipment, etc., and provide a cohesive view of equipment repair needs.Planned
7The center shall receive equipment availability and materials storage status information from storage facilities to support the scheduling of roadway maintenance and construction activities.Planned
8The center shall support an interface with a map update provider, or other appropriate data sources, through which updates of digitized map data can be obtained and used as a background for the scheduling of roadway maintenance and construction activities.Planned
9The center shall collect current and forecast traffic and weather information from traffic management centers and weather service providers (such as the National Weather Service and value-added sector specific meteorological services).Planned
10The center shall dispatch and route maintenance and construction vehicle drivers and support them with route-specific environmental, incident, advisory, threat, alert, and traffic congestion information.Planned
11The center shall manage an interface with center personnel to accept vehicle systems control information and remotely control maintenance and construction vehicle on-board equipment.Planned
12The center shall track the status of roadway maintenance and construction activities by monitoring collected data from the dispatched vehicles and equipment.Planned
13The center shall report the status of field equipment maintenance activities to the centers that operate the equipment.Planned

Functional Area: MCM Vehicle and Equipment Maintenance Management

Monitors vehicle and equipment condition, tracks maintenance history, and schedules routine and corrective maintenance.

IDRequirementStatus
1The center shall collect and analyze vehicle diagnostics information from maintenance and construction vehicles. The information includes engine temperature, mileage, tire wear, brake wear, belt wear, and any warnings or alarms concerning the operational condition of the vehicle and ancillary equipment.Planned
2The center shall exchange information with equipment repair facilities including status and history of repairs concerning maintenance and construction vehicles. This information includes vehicle status and diagnostic information, vehicle utilization, and coordination of when vehicles will be available for preventative and corrective maintenance.Planned
3The center shall schedule preventive and corrective vehicle maintenance with the equipment repair facility based on fleet health reports, maintenance records, vehicle utilization and vehicle availability schedules.Planned

Functional Area: MCM Vehicle Tracking

Remotely tracks the location of maintenance and construction vehicles and other equipment; presented to the center personnel.

IDRequirementStatus
1The center shall monitor the locations of all maintenance and construction vehicles and other equipment under its jurisdiction.Planned
2The center shall present location data to center personnel for the fleet of maintenance and construction vehicles and other equipment.Planned
3The center shall support an interface with a map update provider, or other appropriate data sources, through which updates of digitized map data can be obtained and used as a background for maintenance and construction vehicle tracking.Planned

Functional Area: MCM Winter Maintenance Management

Manages winter road maintenance, tracking and controlling snow plow operations, roadway treatment (e.g., salt spraying and other material applications) based on weather information.

IDRequirementStatus
1The center shall respond to requests from emergency management and traffic management centers for hazard removal, field equipment repair, and other winter roadway maintenance.Planned
2The center shall exchange information with administrative systems to support the planning and scheduling of winter maintenance activities. This information includes: equipment and consumables resupply purchase request status, personnel qualifications including training and special certifications, environmental regulations and rules that may impact maintenance activities, and requests and project requirements from contract administration.Planned
3The center shall provide status information about scheduled winter maintenance activities including anticipated closures and impact to the roadway, alternate routes, anticipated delays, closure times, and durations. The information is provided to other management centers such as traffic, emergency, transit, traveler information providers, other maintenance centers, and the media.Planned
4The center shall receive equipment availability and materials storage status information from storage facilities to support the scheduling of winter maintenance activities.Planned
5The center shall support an interface with a map update provider, or other appropriate data sources, through which updates of digitized map data can be obtained and used as a background for the scheduling of winter maintenance activities.Planned
6The center shall collect real-time information on the state of the regional transportation system from other centers including current traffic and road conditions, weather conditions, special event and incident information and use the collected information to support winter maintenance operations.Planned
7The center shall dispatch and route winter maintenance vehicle drivers and support them with route- specific environmental, incident, advisory, threat, alert, and traffic congestion information.Planned
8The center shall determine the need for roadway treatment based on current and forecasted weather information, current usage of treatments and materials, available resources, requests for action from other agencies, and recommendations from the Maintenance Decision Support system, specifically under winter conditions. This supports winter maintenance such as plowing, treating, anti-icing, etc.Planned
9The center shall provide dispatch instructions for vehicle operators based on input parameters from center personnel, specifically for winter conditions. This could include a treatment route, treatment application rates, start and end times, and other treatment instructions.Planned
10The center shall support remote control of on-board maintenance and construction vehicle systems and field equipment that is remotely controlled by the vehicle such as adjusting material application rates and spread patterns.Planned
11The center shall assess the current status of all winter maintenance activities, including actual work activities performed, current locations and operational conditions of vehicles, materials and equipment inventories, field equipment status, environmental information, etc.Planned

Functional Area: MCM Work Activity Coordination

Disseminates work activity schedules and current asset restrictions to other agencies. Work schedules are coordinated, factoring in the needs and activities of other agencies and adjacent jurisdictions.

IDRequirementStatus
1The center shall provide work zone activities affecting the road network including the nature of the maintenance or construction activity, location, impact to the roadway, expected time(s) and duration of impact, anticipated delays, alternate routes, and suggested speed limits. This information may be augmented with images that provide a visual indication of current work zone status and traffic impacts.Planned
2The center shall provide status information about scheduled maintenance and construction activities including anticipated closures and impact to the roadway, alternate routes, anticipated delays, closure times, and durations. The information is provided to other management centers such as traffic, emergency, transit, traveler information providers, other maintenance centers, multimodal transportation providers, rail operations, and the media.Planned
3The center shall collect and respond to feedback concerning scheduled maintenance and construction activities with other management centers such as traffic, emergency, transit, and rail operations.Planned
4The center shall collect and disseminate asset restriction information levied on transportation asset usage based on infrastructure design, surveys, tests, or analyses. This includes standard facility design height, width, and weight restrictions, special restrictions such as spring weight restrictions, and temporary facility restrictions that are imposed during maintenance and construction.Planned
5The center shall exchange information with administrative systems to support the planning and scheduling of maintenance and construction activities. This information includes: equipment and consumables resupply purchase request status, personnel qualifications including training and special certifications, environmental regulations and rules that may impact maintenance activities, and requests and project requirements from contract administration.Planned
6The center shall exchange rail schedules and work plans with rail operations centers.Planned

Functional Area: MCM Work Zone Management

Remotely monitors and supports work zone activities, controlling traffic through dynamic message signs (DMS), highway advisory radio, gates and barriers, and informing other groups of activity (e.g., traveler information systems, traffic management centers, other maintenance and construction centers).

IDRequirementStatus
1The center shall generate new work zone activity schedules for use by maintenance and construction vehicles, maintenance and construction operators, and for information coordination purposes.Planned
2The center shall control the collection of work zone status information including video images from cameras located in or near the work zone.Planned
3The center shall disseminate work zone information to other agencies and centers including traffic, transit, emergency management centers, other maintenance centers, traveler information providers, and the media.Planned
4The center shall control traffic in work zones by providing remote control of dynamic message signs, highway advisory radio systems, gates, and barriers located in or near the work zone.Planned
5The center shall exchange information with administrative systems to support the planning and scheduling of work zone activities. This information includes: equipment and consumables resupply purchase request status, personnel qualifications including training and special certifications, environmental regulations and rules that may impact maintenance activities, and requests and project requirements from contract administration.Planned
6The center shall collect real-time information on the state of the road network including current traffic and road conditions to support work zone scheduling and management.Planned

Functional Area: MCM Work Zone Safety Management

Remotely monitors work zone safety systems that detect vehicle intrusions in work zones and warns crew workers and drivers of imminent encroachment. Crew movements are also monitored so that the crew can be warned of movement beyond the designated safe zone.

IDRequirementStatus
1The center shall provide remote monitoring and control of work zone safety devices - including intrusion detection devices that have been installed in work zones or maintenance areas.Planned
2The center shall provide remote monitoring and control of intrusion alert devices that have been installed in work zones or maintenance areas.Planned
3The center shall collect status information of work zone safety device status from field equipment or the maintenance and construction vehicles.Planned
4The center shall collect and store work zone data collected from work zone monitoring devices (such as intrusion detection or alert devices and speed monitoring devices) on-board the vehicle and at the roadside.Planned